Industry Expert Blogs
Great, India's having fabs! But, is the tech choice right?Pradeep's Point! - Pradeep ChakrabortySep. 16, 2013 |
The government of India recently approved the setting up of two semiconductor wafer fabrication facilities in the country. It is expected to provide a major boost to the Indian electronics system design and manufacturing (ESDM) ecosystem. A look at the two proposals:
Jaiprakash Associates, along with IBM (USA) and Tower Jazz (Israel). The outlay of the proposed fab is about Rs. 26,300 crore for establishing the fab facility of 40,000 wafer starts per month of 300mm size, using advanced CMOS technology. Technology nodes proposed are 90nm, 65nm and 45nm nodes in phase I, 28nm node in phase II with the option of establishing a 22nm node in phase III. The proposed location is Greater Noida.
Hindustan Semiconductor Manufacturing Corp. (HSMC) along with ST Microelectronics (France/Italy) and Silterra (Malaysia). The outlay of the proposed fab is about Rs. 25,250 crore for the fab facility of 40,000 wafer starts per month of 300mm size, using advanced CMOS technology. Technology nodes proposed are 90nm, 65nm and 45nm nodes in phase I and 45nm, 28nm and 22nm nodes in phase II. The proposed location is Prantij, near Gandhinagar, Gujarat.
Now, this is excellent news for everyone interested in the Indian semiconductor industry.
One look at the numbers above tell me – NONE OF THESE are going to be 450mm fabs! Indeed, both will be 300mm fabs! After waiting for such a long time to even get passed by the Union Cabinet, are these 300mm fabs going to be enough for India? Is the technology choice even right for the upcoming wafer fabs in India? Let’s examine!