Pre and Post-Silicon Verification Have Never Been Closer! Leveraging Portable Stimulus for Automatic Test Equipment (ATE)Cadence Blog - Moshik Rubin, CadenceMay. 08, 2023 |
The initial focus of the Portable Test and Stimulus Standard (PSS) was pre-silicon verification – even if the community, from the beginning, envisioned re-using pre-silicon test content in post-silicon. In this blog post, we will cover new use cases with PSS toward ATE: i.e., Automated Test Equipment typically used in production tests.
The Challenge
The ever-increasing design complexity of technology nodes and new packaging technologies for digital devices has led to a new class of device failures and, consequently, new testing approaches and innovative thinking to overcome the time-to-market pressure of today. These new demands are observed in all value chain steps and push the once silo-based disciplines, such as pre-silicon verification and ATE, to work together.
On the ATE side, the typical production test content is currently dominated by structural tests. However, while the structural test is the foundation for systematic test coverage according to targeted fault models, there is a growing need for functional tests to reach high volume readiness. Accordingly, there is a trend for an increasing amount of functional tests – further amplified by the rising quality expectations in diverse applications (e.g., automotive, data center, high-margin consumer products).
Related Blogs
- Mitigating Side-Channel Attacks In Post Quantum Cryptography (PQC) With Secure-IC Solutions
- Ecosystem Collaboration Drives New AMBA Specification for Chiplets
- ARM vs RISC-V: Beginning of a new era
- Intel Embraces the RISC-V Ecosystem: Implications as the Other Shoe Drops
- Extending Arm Total Design Ecosystem to Accelerate Infrastructure Innovation