7 µW always on Audio feature extraction with filter banks on TSMC 22nm uLL
Intel Drops a Bomb, Not the Ball
By Don Scansen , EETimes (March 26, 2021)
Is $20 billion a lot of money?
Intel rewarded the patient this week as Pat Gelsinger made some very big announcements about the formation of a standalone foundry business, increased partnerships with TSMC for manufacturing of Intel processor products, and a huge promised investment in new manufacturing plants in Arizona. EETimes editor Brian Santo provided an excellent synposis and analysis of Gelsinger’s web presentation.
Up front, let us not ignore the elephant. Rumors have swirled for a very long time that Intel needed to get out of manufacturing because it was “no longer competitive” with TSMC and Samsung. Gelsinger definitely put an exclamation point on his response to the doubters with a commitment of $20 billion to build two new fabs in Arizona.
Intel’s contract manufacturing (Intel Foundry Services) will be a standalone business with its president, Randhir Thakur, reporting directly to the Intel CEO.
![]() |
E-mail This Article | ![]() |
![]() |
Printer-Friendly Page |
Related News
Breaking News
- Breker RISC-V SystemVIP Deployed across 15 Commercial RISC-V Projects for Advanced Core and SoC Verification
- Veriest Solutions Strengthens North American Presence at DVCon US 2025
- Intel in advanced talks to sell Altera to Silverlake
- Logic Fruit Technologies to Showcase Innovations at Embedded World Europe 2025
- S2C Teams Up with Arm, Xylon, and ZC Technology to Drive Software-Defined Vehicle Evolution
Most Popular
- Intel in advanced talks to sell Altera to Silverlake
- Arteris Revolutionizes Semiconductor Design with FlexGen - Smart Network-on-Chip IP Delivering Unprecedented Productivity Improvements and Quality of Results
- RaiderChip NPU for LLM at the Edge supports DeepSeek-R1 reasoning models
- YorChip announces Low latency 100G ULTRA Ethernet ready MAC/PCS IP for Edge AI
- AccelerComm® announces 5G NR NTN Physical Layer Solution that delivers over 6Gbps, 128 beams and 4,096 user connections per chipset