Metrix Driven Hardware Software System Level VerificationAniruddha Baljekar, Srinivas Puttur NXP Semiconductors Pvt. Ltd., INDIA Abstract Industrial data shows that verification takes about 70 to 80 % of the total project development time. With the increasing complexity of the SoC and with increasing software content in the sub-system, System Level Hardware Software verification of the sub-system is one of the challenges for the verification teams. In addition to HW SW coverification, coverage information of the verification goals is extremely important to check the progress of the verification and conclude when the verification cycle can end. One of the other challenges is to be able to run the same system level tests with:
To reduce the verification process, re-use of the verification from the IP level to the System Level Verification is also extremely important to improve TTM. The scope of the paper is to explain the constraint randomized OVM [1] based CDV methodology [4] adopted for HW SW co-verification at System Level Verification by making use of IP level verification resources and enable reuse of the verification framework across product lines within our business Lines. Our paper details the following:
The environment uses following tools/vIP’s:
1. Introduction The paper details out CDV methodology for SoC Verification and advantages of OVM based methodology over other conventional approaches.
2. Motivation Following are the motivations for adopting OVM based methodology for SoC verification:
3. Technical Details 3.1. Verification Environment Overview: Figure:1 Block Diagram: Verification Environment 3.2. Details of the verification components: The verification environment is built using OVM methodology [1]. OVM enables the changing of the environment for a specific scenario on the fly and enables generation of constrained random sequences and configure responses from the peripherals/slaves using OVC’s. The responses can be configured to generate good (error free responses) and error kind of responses to check the robustness of the SoC. The environment allows generation of dynamic traffic which is the key requirement for performance testing apart from the functional checks. The environment also allows a specific master/slave to be replaced by the OVC easily, enabling generation of different scenarios otherwise not possible. Since OVM is a great enabler for layered approach, the environment is designed in a layered manner to be scalable. New features to be verified and/or new requirements of the design are extended with minimum effort. (1) Multi Channel Sequencer Testcase stimulus is implemented using sequences [4]. Co-ordination between various sequences is controlled using virtual sequences. The sequences contain test scenarios to verify the specific feature IP-SOC 2010 Conference – Nov. 30 - Dec. 1, 2010 3 of the IP’s and virtual sequences for implementing test scenarios. Virtual sequences are used to combine sequences and to control the order of execution of different sequences. This is required in an environment that needs different kinds of scenarios to be executed from processor and to coordinate responses from various peripheral OVC’s. Using a real processor in the various environment enables the testing of the firmware/software closed to the one used for the product. (2) SW eVC ISX/Generic Software Adapter (GSA) [2] is a library based e language functions. One can use these functions to write an adapter which enables the verification environment to communicate with the embedded software. GSA functions provide a mailbox memory to implement communication ports between the verification environment and the embedded software. GSA defines the communication protocol to initialize and access this mailbox. The firmware API’s executed on processor can be controlled from the SV virtual sequences using GSA. The methodology is based on a common mailbox implemented in the RAM area which is accessible to both the verification environment and processor. The arguments to be passed from the “e”/SV environment can be randomized and passed to the API’s executed on the processor. The function called from the virtual sequences is posted in the mailbox as the next index to be executed. Based on this index the desired use-case/test sequence is executed. For integrating the SW eVC to application code stub files need to be generated for the SW eVC. This GSA “c” language stub is compiled with the user application code/embedded software to provide the additional functions to enable integration of GSA with the application code. The generation of the stub is automatically handled by the tool (Specman) in this case.
The steps below list the flow of execution after executing a sequence from the SV/verification environment
(3) Peripheral/Master/Slave OVC’s The peripheral responses are generated using the peripheral OVC’s. These OVC’s can generate and drive traffic on the bus and/or respond to the traffic as a slave. Protocol compliance check on the interface of the peripheral coverage of the bus traffic is built-in feature of OVC’s. The traffic can be easily configured as a fully random/constrained random response. Monitor part of the OVC’s provide the necessary hooks to check data integrity e.g. PCI OVC, USB OVC, OCP OVC, CAN OVC etc The environment consists of OVC’s which are configured as PASSIVE/ACTIVE agents based on the test scenario requirement. Some of the master/s e.g. Processor can be easily changed to BUS OVC with ACTIVE agent to generate the kind of regression traffic otherwise not possible from the processor. This configurable nature of OVC defined by OVM methodology enables the re-use of the verification components from unit level to system level verification. This is an important aspect from the context of robustness of the verification environment and improving TTM. The protocol compliance tests provided as part of the OVC are used at unit level to check the IP level protocol compliance of the Design. This reduces time taken to write tests for protocol compliance checking by the verification engineer. As these compliance tests are quite exhaustive, protocol noncompliance of the Design are found early during the verification cycle and there is very less probability of protocol non-compliance issues found at SOC verification. The issues which might surface during SOC verification would be mostly due to interconnection problems incorrect IP integration. (4) Protocol checkers The protocol checkers which are part of the OVC’s are used for checking protocol compliance for all simulation runs. E.g. PCI, USB, I2C protocol checkers. (5) Scoreboard/Data checkers Scoreboard is implemented to check the data integrity of the incoming data and outgoing data. Data on both sides may have different forms, which is the function of the IP. The scoreboard interprets the data and makes it suitable for comparison. Incase the data from both sides is not equal, the specific datapath is not correct and the execution of the test cases can be stopped with an ERROR message. During an end of a simulation all the scoreboard lists will be checked to ensure that the list are empty to ensure that all the data is accounted for. ERROR message is issued in case the scoreboard lists are not empty at the end of simulation runs. The IP level scoreboards are re-used at subsystem/ SOC level by mapping them to correct interface signals. The functionality of the Scoreboard does not change. (6) “C” testcase/Firmware running on Processor The “C” testcase/API’s of HAL are mapped to the GSA. This enables to call the required “C” function/API from the SV sequences. The execution of these functions is controlled from the virtual sequences. This enables the executing of the SW/Firmware closest to the one required for the product which can be controlled from the verification environment. By defining proper coverage matrix it is possible to know the coverage details of “C” API/function/variables. Since these API’s/firmware is the most important part of the overall product, the firmware API’s used for verification of individual IP’s are put together as library and used at sub-system/SOC level to verify the sub-system/SOC functionality. With suitable modifications the API’s/Firmware are re-usable for newer version of the product as ISX makes it easy to re-use. (7) Coverage The critical global software variables and functional features important from the SoC context can be covered. The coverage items/vPlan from the unit level verification environment can be easily integrated to the System Level coverage items and cover only the important features from the SoC context. (8) System verilog to “e” adapter for GSA This verification component is responsible to translate the SV sequences to “e” sequences [3] using the multi-language interoperability feature of the OVM. (9) Using SimVision to trace embedded S/W with ISX ISX provides a SimVision plug-in to help debug embedded software in a simulation environment. The plug-in is a multi-instance window type called Embedded Software Trace. This allows tracing the execution of embedded software along with the hardware design, directly correlate the hardware and software behavior across simulation time. The plug-in is most useful when there is no other way to debug embedded software interactively with an external source-level debugger e.g. gdb. With this its possible to do a post simulation debugging. Following are the requirements to do a S/W tracing:
Figure: 3 Embedded Software Trace shows ease of the use of debugging software C code and its corresponding disassembly with respect to instruction execution on the CPU. Figure: 3 Embedded Software Trace (10) Transaction recording for “e”/SV transactions The OVC monitors are extended to provide transaction recording of the transactions. This allows the responses/initiator sequences generated by the OVC to be debugged simultaneously with the hardware i.e. directly correlating hardware and captured transactions. Transaction recording allows the details of the transactions to be captured at a high level of abstraction instead of the details of the pin level transactions. This helps during the debugging of the hardware. Figure: 4 Transaction recording 3.3. What the verification environment offers? The verification environment offers/enables following:
4. Next Steps
5. Summary
6. Limitations Due to multiple vIP’s used in the environment the simulation run time is quite slow. This would prove to be an issue while executing the full product software and debug failures. 7. References [1] OVM reference manual from OVM world (www.ovmworld.org) [2] Incisive Software eXtensions user guide [3] “e” Language Reference from Cadence [4] IPCM documentation from Cadence
|