Integrating high speed IP at 5nmBy Subindrao Johal, Principal Engineer at Sondrel and Pavan Patel, Engineer at Sondrel Introduction: The advancements in deep submicron technology and adding multiple functionalities to reduce costs combined with scaling existing operations means that SoC designs become ever more complex. The biggest driving factors to go below the 16nm process node are the decrease in power and the increase in performance due to the higher transistor densities of these advanced nodes. However, doing so creates challenges to physical Implementation and timing/power closure. In particular, highspeed IP such as SerDes, DDR, PCIE integration in a large SoC needs careful floor planning to reduce the project time as well as achieve timing/power signoff. In this article, we will look at the new challenges which have been introduced due to 5nm technology as well due to new additional functionality in SoC. We will show the approach to tackle the floor planning and timing issue to reduce the physical implementation iteration. Methodology The implementation of large, complex IP integration needs a methodology that efficiently closes the floorplan signoff criteria as well as preventing large timing violations at a later stage. Figure 1: Custom Floorplan Methodology Challenges of 5nm physical design A holistic approach is needed to concurrently address the planning, editing and optimization environment for the project along the path from SoC to advanced packaging techniques (like InFo/Feveros/X-Cube). As well as considering the impact backwards up the path of decisions. For example, by iterating the placement bumps, PADs and macros early in the process enables the turnaround time to be reduced. Another thing to be considered and planned for early in the process are thermal effects long before place and route in order to improve yield and reliability by designing out hot spots that can lead to failures. For example, standard cells packed at high density can create hot spots. This is because, at 14/16 nm nodes, three to four fins are used to provide structural stability to each gate but, below 7nm, two are used. These are higher to compensate for the reduced number of fins and still give the reinforcement required. However, care should be taken with standard cell placement as fins surrounded by dielectric (gate oxide) have poor thermal conductivity and therefore do not dissipate heat as well as expected creating a hot spot. Therefore, doing an early stage of power analysis (Dynamic/Static) helps to prevent hot spot surprises at a later stage at power signoff. Lastly, process and voltage variation intensity are higher at lower geometries. To combat this, PT-ECO signoff typically needs more than twelve iterations for large complex blocks due to noise and transition requirement. Challenges of integrating high speed blocks Partially hardened IP has higher state of flux because of continuous improvement of the hard IP from the analog team. This can be addressed by using models that were tailored for different design stages with increasing level of complexity and completeness as we approach tapeout. Having IP collateral and the list of IP deliverables as soon as possible in the process are vital to a swift and successful integration. Lastly, design complexity at Floorplanning, DFT integration, Custom Clock tree and timing/power signoff all require scripting knowledge and basic IP understanding to tweak implementation. Floorplan Challenges: On a recent design, the foundry provided a multi-height library and, initially, it was difficult to pass the grid checks. The problem was that we were implementing our design using a power efficient library however the third-party IP was on high performance library. Hence, placement of both library types had to be on least common multiple (LCM) rows. Things to look out for are:-
The Floorplanning Goal This is to have a clean Design Rule Check (DRC) and Layout Versus Schematic (LVS) design that follows the design implementation guideline as well as the timing/congestion aware macro placement. These are the stages of how to achieve this by improving a floorplan. NB a Synopsys Fusion compiler is used in this example. 1- Grid creation is required due to there being multiple vendors of third-party IP, so generating a grid provides uniformity for interconnection: create_grid -type block -x_step $cell_site_pitch-y_step $cell_row_pitch -orientations "R0 MX" Macro_wrapper 2- When you do a floorplan, you will need to do manual routing of the high-speed signals. You will need to avoid any placement or routing by creating blockages over the area using
For example:
Figure 2: Block and signal routing over high speed macro 3- Power Grid (PG) connectivity requires that the PG mesh routing follows the pre-connection command defined by implementation. Hence, we need to connect analog PG ports and BUMP connections along with digital power/ground connectivity. Example: Connect_pg_net –net VDD [get_pins BUMPS_VDD_*/BUMP] 4- Extra signal and special connections as defined by the Analog team to connect at block level can be challenging when you have insufficient or incomplete Library Exchange Format (LEF) but must need to do to check Block level and Chip level Layout Versus Schematic (LVS). Figure 3: Manual routing which connects Special analog signal
5- ESD cell and TCD (Test-key Critical Dimension) checks are needed. The electrostatic discharge macro is required to protect high speed analog macros. TCD cells are employed to monitor the critical dimension such as minimum line width, etc. Also check the critical dimension of cells to ensure layout uniformity during fabrication to improve the yield. Note: We place ESD cells near to Hard IP and supplied the same voltage as that is required by the Hard IP for efficiency. Figure 4: Schematic diagram
6- Terminal/Port placement checks. These are the common and simple checks of floor planning to spot errors. Example: violation to check.
7- Power Grid Design Rule Checks: Write out PG DRC reports and compare Implementation tool PG DRC with floorplan signoff (rule deck aware) DRC of ICV/Calibre. If DRC violations such as Illegal overlap, insufficient width, minimum metal width min metal area, illegal shapes or min metal edges, try to debug the PG mesh scripts and manual PG via insertion scrips. Note: Shorts and Opens on the PG should be clean before further executing the next step during the tentative signoff iteration. In conclusion, Sondrel has been working on advanced nodes for decades and already has several 5nm designs under its belt which were used to create this list of checks and suggestions that can help master the challenges of 5nm design. Further articles can be found at https://www.sondrel.com/solutions/white-papers About the author