|
|||
Slow India may lose Cricket wafer fabBy Peter Clarke, EETimes Europe Cricket Semiconductor, an analog and power pure-play foundry project that was being prepared for touch down in India, is running late and could end up being constructed in a different country. The plan, announced in 2015, was for Cricket to break ground for an analog and power circuit wafer fab in 2016 – with Indore in Madhya Pradesh as the likely location – and that it would begin producing chips in 2018. "The project has taken longer than we had anticipated, and it may continue to move at a pace that is slower than our preference," Lou Hutter, a former Texas Instruments executive working on the project, said in email correspondence with EE Times Europe. |
Home | Feedback | Register | Site Map |
All material on this site Copyright © 2017 Design And Reuse S.A. All rights reserved. |