|
|||||
Physical design team tackles challenging SoC
Physical design team tackles challenging SoC When describing the complexity of deep sub-micron systems on chip (SoCs), most engineers and their managers tend to refer to a combination of gate count, amount of embedded memory, and frequency of operation. If one's task is to assess the complexity of the physical design effort for a given SoC, then there are numerous additional factors that can create challenges far more significant than the sheer size or frequency of the design. An example of one such SoC is clearly illustrated by ReShape's recent experience in performing the physical design work for a customer's SoC project. ReShape has traditionally focused its efforts on very large SoC designs, usually containing many millions of gates, megabits of memory distributed over hundreds of individual RAMs, and with frequencies of operation well over 200 MHz. In contrast, this customer's design had less than one million gates of logic. It had about 500 kilobits of embedded memory spread over 23 standard RAMs plus 6 megabits of memory in a single MoSys 1-T SRAM. Its primary frequencies of operation were 162 MHz and 81 MHz. From these statistics alone, most physical design engineers would not consider this SoC to be extremely challenging, yet when one looks into the next level of details the unique challenges become apparent. Small Chip, Big Constraints The biggest constraints were with respect to functional I/O locations, and specifically, the LVDS (Low Voltage Differential Signaling) interface. The LVDS interfaces on both chips and the board were designed such that the two chips' LVDS interfaces would basically abut. This constraint provided no latitude on where the LVDS I/O pads could be located. Being differential, these I/O pads were very wide and occupied the majority of one side of the chip. From a timing perspective, the first chip and board consumed the majority of the available timing budget for the LVDS interface. This imposed a very tight data valid window and, hence, an extremely tight clock skew requirement on the interface. Besides I/O location, minimum area was another major constraint of the design. While certainly a common constraint for most SoCs, this chip had a single memory that occupied half the active area. This essentially locked the dimension of the chip in both directions; the X direction was determined by the width of the MoSys RAM, the Y direction by the overall area limit for the design. This forced all other components into a very small, very dense fixed size region. This region had to include three mixed signal components, 23 embedded RAMS, and a CPU. The floorplanning options of this region were quite limited. The fixed positions of the I/O largely fixed placement of the as sociated mixed signal components. Additionally, the mixed signal components had a large "keep out" area where standard cells, macros, and routing were not allowed. The embedded RAMs needed to be placed such that the design was routable, while avoiding the mixed signal components and yet fitting into the available X and Y dimensions. Together these factors compressed the area available for the core logic and increased the already high utilization. In such situations designers need to quickly explore floorplan alternatives. The floorplan in subsequent iterations could be easily modified since ReShape's internal tool, GDS Builder, can place objects relative to other objects or reference points (for instance, place macro2's lower left corner next to, or a certain distance from, macro1's lower right corner). GDS Builder was used to automate chip construction. GDS Builder automatically kicked off Synopsys AstroExpress place and route jobs, as well as timing, IR drop and electromigration analysis on t he entire design overnight. ReShape's overnight full-chip builds enabled us to explore the multiple floorplanning alternatives using the production placer and router. In doing so we came up with the optimal floorplan that met all the constraints implied by the design. There was 100 percent timing and area correlation between these early floorplan explorations and the final taped out chip. Mountains and boulders The largest of these macros was the MoSys 1-T embedded memory that occupied half the active area of the chip. If the other embedded memories were considered to be boulders in the sea of standard cells, the MoSys memory would t hen be a mountain. Although signals between the I/O pads and standard cell core could be routed over the MoSys memory, it was too large a distance to go without buffering the signals. The only choice was to go around the MoSys memory, leaving narrow tracks along the top and the sides of the memory where ReShape GDS Builder's automated repeater insertion could place appropriate buffers along the way from the I/O pads to the standard cell core. Power distribution also proved to be a challenge with respect to the MoSys memory. Core power had to be routed from the top of the die over the MoSys to the standard cell core. Metal layers 5 and 6 were mostly available for this purpose, but with some irregularly placed obstructions. This forced us to construct a customer power cover cell that fed the standard cell core with adequate power. The adequacy of this power strategy with respect to IR drop and electromigration was then verified using Astro-Rail. One of the advantages from a system perspective of u sing MoSys memories is the high density and wide parallel data interface. From a physical design perspective, however, the wide interface also creates a significant amount of routing congestion near the data pins. To avoid this congestion, placement obstructions for standard cells had to be created. This, of course, required even higher utilization to be achieved in the standard cell core area. Placing the I/Os The second I/O library was required for the LVDS interface. It contained high profile and large width cells that did not include bond pads. To accommodate non-LVDS I/O adjacent to LVDS cells, a third library wa s required. This was a high profile library with narrow pitch and non-integrated bond pads. The fourth I/O library was for analog I/O and was also high profile. Cells from different libraries with differing heights were mixed on the same side of the chip. This forced the creation of special filler and corner cells to interface between the different height cells. Special consideration was required as to how the different height I/O power pads were to connect to the internal power grid. Figure 1 shows the transition from the low profile I/O cell to the high profile I/O cell through a custom filler cell. The special connections from the low profile I/O cell power pads to the core power ring are also visible. Figure 1 - Chip section showing I/O transition To further complicate matters, there were seven distinct power domains associated with the I/O ring. These domains were for the LVDS interface, the various analog domains, and the primary 3.3 volt and 1.8 volt power domains. The creation of this I/O ring was handled with a proprietary pad ring creation tool developed by ReShape. The LVDS portion of the pad ring proved to be especially challenging. As these signals were the most timing sensitive in the design, it was decided to place LVDS related "edge logic" in the actual pad block that contained the LVDS I/O pads. This approach allowed us to meet a very restrictive timing budget required by the customer. Smaller is not always easier To truly understand the impact of the above factors, it is critical to have a design environment that allows quick, overnight exploration of the various design alternatives. ReShape's chip designers found that GDS Builder's ability to perform full-chip build experiments, and to manage and interpret the resulting data, greatly enhanced the ability to explore design alternatives to meet conflicting design requirements. Able to automate the chip building process, ReShape engineers taped out 16 days after receiving the final netlist and IP. Lane Albanese is director of ReShape's Design Center. He has over 15 years experience in integrated circuit design and design management. He has worked for Raytheon, Number Nine Visual Technology, and Philips Semiconductors. During his five and a half year tenure at Philips, Lane was the Director of IC Engineering for the group that designed the PNX8500 Set-top Box and Digital Television SoC that won the EDA Consortium 2002 Design Achievement Award.
|
Home | Feedback | Register | Site Map |
All material on this site Copyright © 2017 Design And Reuse S.A. All rights reserved. |