|
|||
How the CHIPS Act Will Impact EngineersBy C.D. McGrady, EETimes (October 21, 2022) The $52 billion spending plan outlined in the CHIPS and Science Act that has been signed into law has significant implications for the semiconductor ecosystem—from chip manufacturers to engineers and production teams. EE Times asked two design engineers to weigh in on the implications of the Act for engineers in the U.S., in the short and long term. Will it simply help return the design engineering process to status quo pre-2020? Or are there greater changes afoot that will drive a significant shakeup of the semiconductor design and manufacturing process? The answer lies somewhere in between. |
Home | Feedback | Register | Site Map |
All material on this site Copyright © 2017 Design And Reuse S.A. All rights reserved. |